REP PMCB 2026: how the sanctions change for French construction firms
Three years after the launch of the French construction REP scheme, controls are intensifying. Decoding what awaits craftspeople and general contractors in 2026.
Construction combines field mobility, tight margins and regulatory constraints (certificates, compliance, hardship). Off-the-shelf software is either too generic or too rigid for each company's specifics.
The tender response copilot: it reads the tender file, prices the job and drafts the technical memorandum in your voice.
Before talking software, we talk pain points. If you don't recognize any of these three, we are probably not the right partner for you.
Time tracking is on paper, entered three times (site, payroll, billing) with systemic errors. Overtime, meal allowances and travel don't follow. Site managers spend Monday rebuilding the week.
1 day per week lost rebuilding hours
48-72h to issue a quote while competitors answer in 24h. Amendments are managed in Word, versions are lost, the client disputes. Margin melts between quote and final invoice.
1 site in 5 lost due to quoting delay
You know whether the year overall is good, not whether THIS site is. Impossible to identify which site types lose you money, hence impossible to stop bidding on them.
20-30% of loss-making sites undetected
When your processes require a replayable audit trail, sagas with compensation, or compliance by construction, we ship an event-driven architecture (DDD + CQRS + Event Sourcing), not a CRUD layered with audit logs.

For mid-cap construction companies subject to CSRD: every material consumption, kWh and tonne of CO₂ flowing back from the site is recorded as an inalterable fact. ESRS E1-E5 reporting is reconstructed on demand, with no after-the-fact entry, directly auditable by your statutory auditor.

Full cycle Quote → Subcontracting → Work acceptance → Customer billing → Subcontractor payment, with clean automatic recovery on snag rejection or guarantee retention. No link can be forgotten, no payment stays orphaned.

Every technical decision on a site (material choice, amendment modification, stage validation) is kept for 10 years in tamper-proof form. In case of decennial damage, exact reconstruction of history at the date of incident, evidence admissible to the insurance expert.

Mandatory tracking of incoming and outgoing materials per site with dematerialized waste-tracking slips (Trackdéchets), Building Information Booklet (CIL) constituted at delivery and fed for 10 years, automatic generation of REP construction eco-contributions. REP PMCB and CIL compliant by construction, avoids CITEO sanctions and reception blocks.
For everything else (CRM, portals, scheduling, billing), we ship a custom application, on your design system and with your existing integrations.

10-second time entry from the foreman's phone: who, where, what. Geolocation to verify on-site presence. Overtime, meal allowances, travel automatically detected and sent to payroll.

Pricing-element library, 30-minute quote generation, electronic signature. Each amendment is a new tracked version, with unit-price and margin history.

Photos from the site, geolocation, assignment to a worker, snag-resolution time tracking. The customer signs snag closure from their phone, no commercial visit needed.

Per-site Gantt view, per-worker team scheduling, equipment availability management. Conflicts auto-detected (one person on two sites, a lift booked twice).
Business compliance and key integrations are not options, they are prerequisites built in from the start.
Monthly nominative social declaration
Social contributions and construction paid-leave fund
Mandatory professional ID
Mandatory B2G electronic invoicing
Professional prevention account
Tracking mandatory insurance
Mixed firms (accounting + audit, accounting + advisory, accounting + legal) draw from several industries. Here are those that share the most challenges.
Réglementations, virages business, sous-domaines en mutation : ce que notre pôle veille publie sur le secteur Construction & Site.
Three years after the launch of the French construction REP scheme, controls are intensifying. Decoding what awaits craftspeople and general contractors in 2026.
Les réglementations qui pèsent sur les choix logiciels (appliquées, partielles, ou imminentes), décryptées par notre pôle veille.
Responsabilité Élargie du Producteur, Produits et Matériaux de Construction du Bâtiment
Filière REP qui finance la collecte et la valorisation des déchets de chantier. Sanctions actives en 2026 pour les artisans et entreprises BTP.
EU Deforestation Regulation, Règlement (UE) 2023/1115
Règlement européen interdisant l'import et la mise sur le marché de produits issus de la déforestation. Applicable aux PME le 30 juin 2026.
Facturation électronique B2B obligatoire en France
Réforme française de la facturation électronique B2B. Réception au 1er septembre 2026 pour toutes les entreprises ; émission progressive 2026-2027.
Réglementation Environnementale 2020
Réglementation française des bâtiments neufs : performance énergétique + carbone. Seuils Ic Construction durcis en 2025 et 2028.
30 minutes to scope your need, identify the link with your payroll (Sage, Cegid, Silae, PayFit) and price the project.